From subfloor prep to final inspection, we install solid and engineered hardwood floors with precision. Every board is hand-selected, acclimated to your home, and fastened with care.
A flawless installation starts long before the first board goes down. We prep the subfloor to ensure it's level, dry, and structurally sound. We acclimate your flooring to the home's humidity levels — a critical step many skip. Then we lay each board by hand, hand-nailing or gluing as required for the species and subfloor type. We follow National Oak Floor Manufacturers Association (NOFMA) specifications for every installation, so you can trust the work will hold up for generations.
Our Process
Subfloor Prep
We flatten, dry, and stabilize the subfloor before any flooring goes down.
Acclimation
Wood is delivered and allowed to reach equilibrium with your home's humidity.
Layout Planning
We map the room to minimize cuts and optimize visual flow.
Installation
Boards are hand-laid and fastened to NOFMA specifications.
Final Inspection
We walk every square foot, checking for gaps, squeaks, or imperfections.